McCord Investments

Power and industrial equipment sourcing

Send a requirement

Short lead time transformers, 15 kVA to 300 MVA+

Padmount in about 9 weeks ex-factory, UL, cUL and CSA certified. Lead time confirmed on every quote.

Get a quote

The transformers, switchgear and electrical balance of plant our data centre and energy clients use alongside their turbines. We work with one partner, chosen after reviewing the market for speed, engineering and quality.

Quotes by email to

Why our clients use this partner

  • Speed

    Our partner runs short production and delivery cycles, turns bids around for tight tender schedules, keeps qualified backup factories and times delivery to when the site is ready.

  • Compliance and specification

    Its units are engineered to CSA, IEEE, IEC and ANSI standards, cUL and UL listed and built to NRCan and DOE efficiency, with standard documentation ready for approvals.

  • Engineering

    It manages each order from design to delivery, factory tests every unit, ships shop drawings, test reports and installation manuals, and keeps warehouses and service teams in Canada and the US.

Lead times

  • Padmount transformers

    75 kVA to 10 MVA

    Three-phase, oil-filled, for utility, commercial and industrial sites.

    About 9 weeks ex-factory

  • Dry-type transformers

    15 kVA to 30 MVA, up to 36 kV

    Cast resin and VPI, for indoor substations, data centres and commercial buildings.

    8 to 16 weeks ex-factory

  • Power and substation transformers

    1 MVA to 300 MVA+, up to 345 kV

    Oil-filled units for generation, utilities, mining and heavy industry.

    6 to 12 months

Typical lead times through our partner.

For comparison, Wood Mackenzie put average US lead times in Q2 2025 at about 30 weeks for distribution transformers and 128 weeks for power transformers. EE Power, August 2025

Standards and certification

Padmount units are UL, cUL and CSA certified, for use in the US and Canada. Power transformers are built to CSA, IEEE and ANSI standards, and our partner also engineers to IEC, the standard used in most other markets. Certification is confirmed on each quote.

In Canada, installed electrical equipment must carry the mark of a certification body accredited by the Standards Council of Canada, or an approved field evaluation label. Electrical Safety Authority: recognized certification marks

Specifications

Padmount transformer

Rating
75 kVA to 10 MVA
Primary voltage
5 kV to 44 kV, multi-primary available
Secondary voltage
600Y/347 V (Canadian standard), 480Y/277, 400Y/230 or 208Y/120
Impedance
5.75% design
Cooling and fluid
ONAN or KNAN; mineral oil, natural ester or FR3
Windings
Copper or aluminium
Options
Dual voltage, NGR, surge arresters, load break switch
Listing
UL, cUL and CSA certified; CSA, NRCan and DOE efficiency

Power transformer

Rating
1 MVA to 300 MVA+
High voltage
69, 138, 245 and 345 kV
Frequency
60 Hz
Insulation
Mineral oil, natural ester or FR3
Standards
UL, CSA, ANSI and IEEE

Metal-enclosed MV switchgear

Current rating
200, 400 and 600 A
Voltage
Up to 36 kV
Bus
Copper
Standard
CSA

High voltage breakers

Rated voltage
40.5 kV to 800 kV
Rated current
2,000 to 5,000 A
Breaking current
31.5 to 63 kA
Operating mechanism
Spring, pneumatic or hydraulic
Standards
IEEE and ANSI

Dry-type and E-house specifications on request.

Get a quote

Email is quickest: . Or use the form below, and we come back with a price and a confirmed lead time.

Quantity, voltages and drawings can go here or follow by email.

Common questions

How quickly can I get a padmount transformer?

Typically about 9 weeks ex-factory, confirmed on the quote.

Is 9 weeks the delivery date?

No. About 9 weeks is the typical time to leave the factory. Transit to your site depends on location and is confirmed on the quote.

Are these approved for use in Canada?

Padmount units are UL, cUL and CSA certified. For power transformers, certification is confirmed on each quote.

Can I get a power transformer in under a year?

Typically 6 to 12 months for power and substation transformers, confirmed on the quote.

Do you source dry-type transformers for data centres?

Yes, from 15 kVA to 30 MVA, typically 8 to 16 weeks ex-factory.

What sizes of transformer do you cover?

From 15 kVA to 300 MVA+: padmount, dry-type and power and substation transformers, with medium voltage switchgear and high voltage breakers.

Do you supply sites in the US?

Yes, for sites in Canada and the US. Our partner keeps warehouses and service teams in both.

What do I need to send for a quote?

The transformer type, the rating, the site and the date it is needed on site. Drawings or spec sheets can go to powergen@mccordinvestments.com.

External document

The publisher’s own file. It may download rather than open.

Open the document