Northwest Territories
Northwest Territories Power Corporation; diesel and hydro mixed grid, no unified territorial grid connecting all communities
Not a viable near-term data centre jurisdiction: roughly two-thirds diesel generation, no surplus firm hydro capacity, and no data centre policy of any kind.
0MW
energized in Northwest Territories
0 with published capacity
The record
- Interconnection
- There is no data centre connection process, tariff, or policy in the Northwest Territories.
- Tariff
- No tariff or policy exists for data centres.
- Years to grid power
- n/a, no relevant process or surplus capacity exists
- Years behind the fence
- n/a, not addressed in sourced material
- Basis for those years
- Diesel is roughly 68% of NWT installed generating capacity, while actual 2021 generation was about 47% petroleum and 36% hydroelectric. No data centre load, policy, or connection process identified.
Dated events
- Canada Energy Regulator's territorial energy profile documents NWT's generation mix.
Record updated 2026-08-01. Corrections: sam@mccordinvestments.com