McCord Investments

Power and industrial equipment sourcing

Send a requirement

Tell us what you need, and when you need it

We source for data centre developers, IPPs, plant owners and institutional investors buying for their own sites. Tell us what you need and we will come back on whether a route exists.

Email is quickest. Specs, datasheets and photos to

The equipment

Status required
Voltage and configuration

Who is asking

Common questions

What should a turbine requirement include?

The model or class, capacity per unit, frequency and fuel, the site, the date it is needed on site and the condition you will accept. With those we can tell you what exists against your date.

Do you look at new and used units?

Yes, both, against your date. A new unit can mean a long wait for a large frame turbine; used and surplus units are already built.

Do you work with 50 Hz and 60 Hz turbines?

Yes, both. We scope 50 Hz and 60 Hz conversions with engineering partners: generator, gearbox and controls.

External document

The publisher’s own file. It may download rather than open.

Open the document