McCord Investments

Power and industrial equipment sourcing

Send a requirement

Home / Provinces / PE

Prince Edward Island

Maritime Electric (utility and system operator); Island Regulatory and Appeals Commission, IRAC (regulator); Province of Prince Edward Island (owner of the submarine interconnection cables, leased to Maritime Electric)

Route to power. Island grid, imports from New Brunswick. Firm import from New Brunswick is 300 MW across four subsea cables. The island peaked at a record 404 MW in January 2026, and load has grown 66 per cent since 2010.


How you connect

Through Maritime Electric’s standard industrial process, overseen by the Island Regulatory and Appeals Commission. There is no data centre process and no data centre rate, and the island already runs close to its limit at winter peak.

New generation

Maritime Electric has applied for two 50 MW combustion turbines in Charlottetown, targeting 2028, and in March 2026 switched to used, refurbished units. The Commission began hearings in August 2026 and has not decided. Maritime Electric says demand for turbines from electrification and data centre building is making them harder to get.

What has happened

  1. Maritime Electric switches to used, refurbished turbines
  2. Maritime Electric narrows its plan to two 50 MW turbines, targeting 2028
  3. Maritime Electric applies for 150 MW of new on-island generation

Updated 2026-09-23.

External document

The publisher’s own file. It may download rather than open.

Open the document