Map / SK
Verified 2026-08-01
Bell AI Fabric — RM of Sherwood
Bell Canada (Bell AI Fabric) / Rural Municipality of Sherwood No. 159, near Regina, Saskatchewan
Construction
300 MW
announced
0 MW
energized
None of it is drawing power yet.
- 2026-03-16 Announced
- 2027-H1 Developer target stated by the developer, not a filed date
- Power path
- Hybrid
- Generation tech
- grid (SaskPower transmission) plus behind-the-fence natural gas turbines for peak/backup
- Utility
- SaskPower
- Queue reference
- Not stated
- Target online
- 2027-H1
- Announced
- 2026-03-16
- Verification
- multiple
- Coordinate
- 50.4452, -104.6189 (region)
Getting power in Saskatchewan
Open and courting, but riding on coal-refurbishment and nuclear plans that are not yet built.
The full Saskatchewan record, with the route to power, the binding constraint and every dated policy event.
Sources
- Bell AI Fabric expands national network with 300 MW data centre in Saskatchewan
- AI data centre: Construction begins at Bell facility near Regina
- Bird selected for massive Bell Canada data centre build in Saskatchewan
- Bell AI Fabric Data Centre Project — Impact Assessment Agency of Canada project record (live-fetched: confirms 'physical activity has substantially begun')
The best-evidenced construction status in this dataset. The federal Impact Assessment Agency of Canada record states the project could not be designated for review because the physical activity had substantially begun, corroborated by CTV’s groundbreaking report and Bird Construction’s selection as contractor. The 300 MW figure matches the IAAC record. Phase 1 targets 200 MW of transmission by the end of 2026, Phase 2 a further 100 MW by the end of 2027.
Other tracked projects in Saskatchewan
- Carpere Valley / Aztec AI Health — Valley View (Moose Jaw) Carpere Valley Development Corporation (rebranded Aztec AI Health Ltd) · 150 MW · Not approved