Map / SK
Verified 2026-08-01
Carpere Valley / Aztec AI Health — Valley View (Moose Jaw)
Carpere Valley Development Corporation (rebranded Aztec AI Health Ltd) / Former Valley View Centre site, south of Moose Jaw, Saskatchewan
Not approved
150 MW
announced
0 MW
energized
None of it is drawing power yet.
- 2025-06-01 Announced
- 2030 Developer target stated by the developer, not a filed date
- Power path
- Grid
- Generation tech
- Not stated
- Utility
- SaskPower
- Queue reference
- Not stated
- Target online
- 2030
- Announced
- 2025-06-01
- Verification
- multiple
- Coordinate
- 50.3933, -105.5519 (town)
Getting power in Saskatchewan
Open and courting, but riding on coal-refurbishment and nuclear plans that are not yet built.
The full Saskatchewan record, with the route to power, the binding constraint and every dated policy event.
Sources
- 150MW data center proposed in Saskatchewan, Canada
- 'Ambitious' $485M project could make Moose Jaw an AI powerhouse
- Moose Jaw resident launches petition calling for pause on proposed data centre
- AI data centre proposed for Moose Jaw won't move ahead without power, says MLA
- Proposed Moose Jaw AI data centre stalls after province denies power request
Denied. On the 150-acre former Valley View Centre site. As of 18 July 2026 Saskatchewan’s Justice Minister and Premier both stated on the record that the province is not allocating grid power and the request was refused, confirmed by SaskToday, MooseJawToday and CKOM.
Other tracked projects in Saskatchewan
- Bell AI Fabric — RM of Sherwood Bell Canada (Bell AI Fabric) · 300 MW · Construction
Last verified 2026-08-01. Corrections: sam@mccordinvestments.com