Convergence Compute Midwestern Canadian Data-Center Campus (Île-des-Chênes)
Jet.AI Inc. / Consensus Core Technologies Inc. (joint venture: Convergence Compute) / North of Île-des-Chênes, RM of Ritchot, Manitoba
Not approved
100 MW
announced
0 MW
energized
None of it is drawing power yet.
- Power path
- Hybrid
- Generation tech
- natural gas turbines (reported, 6 units) plus grid interconnection near Riel Converter Station / Bipole III HVDC corridor
- Utility
- Manitoba Hydro
- Queue reference
- Not stated
- Target online
- Not stated
- Announced
- 2025-12-04
- Verification
- multiple
- Coordinate
- 49.6892, -96.9967 (town)
Getting power in Manitoba
Closed to unsolicited large load: government now picks which projects get power, and it has already said no to at least one data centre.
The full Manitoba record, with the route to power, the binding constraint and every dated policy event.
Sources
- Jet.AI (Nasdaq: JTAI) unveils Winnipeg data-center site (live-fetched: confirms ~350 acres, 2,000MW is substation capacity attribute, not committed project size)
- Manitoba will reject hyperscale AI data centre south of Winnipeg, Kinew says
- Premier says no to massive AI data centre proposed for south of Winnipeg | CBC News
Rejected by the Manitoba government on 4 June 2026 by Premier Kinew. The site is roughly 350 acres, about 10 miles south of Winnipeg. Reported capacity conflicts widely across sources, from 100 to 500 MW; 100 MW is shown as the most conservative independently sourced figure. The 2,000 MW figure cited elsewhere is the substation's available capacity, not a committed project size.
Other tracked projects in Manitoba
- Equinix WI1 Winnipeg (formerly Bell MTS Data Centre) Equinix · 8 MW · Operating
- Bell AI Fabric Rosser (CentrePort) Bell Canada · 6 MW · Construction
Last verified 2026-08-01. Corrections: sam@mccordinvestments.com