Convergence Compute Midwestern Canadian Data-Center Campus (Île-des-Chênes)

Jet.AI Inc. / Consensus Core Technologies Inc. (joint venture: Convergence Compute) / North of Île-des-Chênes, RM of Ritchot, Manitoba

Not approved

100 MW

announced

0 MW

energized

None of it is drawing power yet.


Power path
Hybrid
Generation tech
natural gas turbines (reported, 6 units) plus grid interconnection near Riel Converter Station / Bipole III HVDC corridor
Utility
Manitoba Hydro
Queue reference
Not stated
Target online
Not stated
Announced
2025-12-04
Verification
multiple
Coordinate
49.6892, -96.9967 (town)

Getting power in Manitoba

Closed to unsolicited large load: government now picks which projects get power, and it has already said no to at least one data centre.

The full Manitoba record, with the route to power, the binding constraint and every dated policy event.

Sources

Rejected by the Manitoba government on 4 June 2026 by Premier Kinew. The site is roughly 350 acres, about 10 miles south of Winnipeg. Reported capacity conflicts widely across sources, from 100 to 500 MW; 100 MW is shown as the most conservative independently sourced figure. The 2,000 MW figure cited elsewhere is the substation's available capacity, not a committed project size.

Other tracked projects in Manitoba


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document