McCord Investments

Power and industrial equipment sourcing

Send a requirement

Home / MB

Equinix WI1 Winnipeg

Equinix / Winnipeg, MB

Operating

8 MW

announced

8 MW

energized

Fully energized against what was announced.

A 7.5 MW data centre built by MTS in 2015 and bought by Equinix in 2020 as part of a US$780 million deal for 13 Bell data centres.


Power path
Grid
Setup
Not stated
Utility
Manitoba Hydro
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in Manitoba

Ministerial priority ranking. The Manitoba record covers how projects get power there and what is changing.

Sources

Other tracked projects in Manitoba


Updated 2026-10-14.

External document

The publisher’s own file. It may download rather than open.

Open the document