McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / MB

Verified 2026-08-01

Equinix WI1 Winnipeg (formerly Bell MTS Data Centre)

Equinix / Winnipeg, Manitoba (Fort Garry / south end)

Operating

8 MW

announced

8 MW

energized

Fully energized against what was announced.


Power path
Grid
Generation tech
Not stated
Utility
Manitoba Hydro
Queue reference
Not stated
Target online
Not stated
Announced
Not stated
Verification
multiple
Coordinate
49.8951, -97.1384 (town)

Getting power in Manitoba

Closed to unsolicited large load: government now picks which projects get power, and it has already said no to at least one data centre.

The full Manitoba record, with the route to power, the binding constraint and every dated policy event.

Sources

Built around 2015 by Manitoba Telecom Services and Bell MTS at 7.5 MW, and sold to Equinix as part of a US$780M national deal in 2020. An established, active commercial IBX facility rather than a new project, so its capacity is shown as operating. The 7.5 MW figure traces to a single secondary source.

Other tracked projects in Manitoba


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document