Equinix WI1 Winnipeg (formerly Bell MTS Data Centre)
Equinix / Winnipeg, Manitoba (Fort Garry / south end)
Operating
8 MW
announced
8 MW
energized
Fully energized against what was announced.
- Power path
- Grid
- Generation tech
- Not stated
- Utility
- Manitoba Hydro
- Queue reference
- Not stated
- Target online
- Not stated
- Announced
- Not stated
- Verification
- multiple
- Coordinate
- 49.8951, -97.1384 (town)
Getting power in Manitoba
Closed to unsolicited large load: government now picks which projects get power, and it has already said no to at least one data centre.
The full Manitoba record, with the route to power, the binding constraint and every dated policy event.
Sources
- Manitoba's AI data centre push, explained
- Equinix Completes US$780 Million Acquisition of 13 Bell Data Centers in Canada
- Equinix to Buy 25 Bell Canada Data Centers for $750 Million
Built around 2015 by Manitoba Telecom Services and Bell MTS at 7.5 MW, and sold to Equinix as part of a US$780M national deal in 2020. An established, active commercial IBX facility rather than a new project, so its capacity is shown as operating. The 7.5 MW figure traces to a single secondary source.
Other tracked projects in Manitoba
- Convergence Compute Midwestern Canadian Data-Center Campus (Île-des-Chênes) Jet.AI Inc. / Consensus Core Technologies Inc. (joint venture: Convergence Compute) · 100 MW · Not approved
- Bell AI Fabric Rosser (CentrePort) Bell Canada · 6 MW · Construction
Last verified 2026-08-01. Corrections: sam@mccordinvestments.com