Verified 2026-08-01
DMTC / Hyper Bit Quebec crypto facility
Dogecoin Mining Technologies Corp. (host facility; Hyper Bit Technologies acquirer) / Quebec, Canada (exact site/town not disclosed in public sources found)
Announced
11 MW
announced
0 MW
energized
None of it is drawing power yet.
Not shown on the map. No location has been disclosed for this project beyond Quebec, Canada (exact site/town not disclosed in public sources found). Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.
- Power path
- Grid
- Generation tech
- dogecoin/litecoin mining co-location, renewable-powered grid
- Utility
- Hydro-Quebec
- Queue reference
- Not stated
- Target online
- Not stated
- Announced
- 2025-05-20
- Verification
- press
- Coordinate
- Not disclosed
Getting power in Quebec
Went from selling surplus hydro to data centres to actively pricing and gatekeeping them out.
The full Quebec record, with the route to power, the binding constraint and every dated policy event.
Sources
- Hyper Bit Announces That DMTC Has Commenced Mining DOGE and LTC at 11 MW Facility in Quebec
- Hyper Bit Announces LOI to Acquire Dogecoin Mining Infrastructure Company
Held at announced. Both sources are the same company’s own newswire releases on a self-serve wire service, so they amount to a single account however often republished, and the release language that mining has commenced is not independently confirmed. The location is not disclosed, so the row is not drawn on the map.
Other tracked projects in Quebec
- OVHcloud BHS Campus OVHcloud (OVH Group) · 120 MW · Operating
- QScale Q01 Campus QScale · 96 MW · Operating
- Vantage Quebec City Campus (QC2, incl. QC21/QC23/QC24) Vantage Data Centers · 86 MW · Construction
- Gatineau Data Hub (GDH) AVAIO Capital / Société immobilière ADAM · 50 MW · Not approved
- Bitfarms Sherbrooke – Bunker Keel Infrastructure (formerly Bitfarms Ltd.) · 48 MW · Operating
- UnitedCorp Beauharnois data centre / greenhouse project UnitedCorp · 40 MW · Announced
- eStruxture MTL-2 eStruxture Data Centers · 30 MW · Operating
- Vantage Montreal III (QC6) Vantage Data Centers · 30 MW · Operating