Vantage Montreal III (QC6)

Vantage Data Centers / 21525 Clark Graham Ave, Baie-D'Urfé, QC

Operating

30 MW

announced

0 MW

energized

None of it is drawing power yet.


Power path
Grid
Generation tech
hyperscale colocation, hydro grid power
Utility
Hydro-Quebec
Queue reference
Not stated
Target online
Not stated
Announced
Not stated
Verification
public_filing
Coordinate
45.4136, -73.9095 (town)

Getting power in Quebec

Went from selling surplus hydro to data centres to actively pricing and gatekeeping them out.

The full Quebec record, with the route to power, the binding constraint and every dated policy event.

Sources

Vantage's own page describes it as operational, 30MW critical IT load. Third-party aggregator (datacentermap) lists 89MW for the same facility -- used Vantage's own figure as the stronger source, noted discrepancy. Single source overall; flag.

Other tracked projects in Quebec


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document