Bitfarms Sherbrooke – Garlock

Keel Infrastructure (formerly Bitfarms Ltd.) / Sherbrooke, QC

Operating

18 MW

announced

18 MW

energized

Fully energized against what was announced.


Power path
Grid
Generation tech
bitcoin mining, hydro grid power
Utility
Hydro-Quebec
Queue reference
Not stated
Target online
Not stated
Announced
Not stated
Verification
multiple
Coordinate
45.4042, -71.8929 (town)

Getting power in Quebec

Went from selling surplus hydro to data centres to actively pricing and gatekeeping them out.

The full Quebec record, with the route to power, the binding constraint and every dated policy event.

Sources

The third facility on the Sherbrooke campus, operational since 2022, alongside Bunker and Léger. Keel publishes the campus at 96 MW energized but does not break the figure out by building; 18 MW is the remainder after Bunker at 48 MW and Léger at 30 MW, not a separately disclosed figure. Powered by Hydro Sherbrooke.

Other tracked projects in Quebec


Last verified 2026-08-02. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document