McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / AB

Verified 2026-08-01

Crusoe AI Data Centre - Crossfield Energy Park

Crusoe (Crusoe Cloud); KALiNA Distributed Power (power) / Rocky View County, AB (near Crossfield)

Announced

170 MW

announced

0 MW

energized

None of it is drawing power yet.


Power path
Behind the fence
Generation tech
natural gas CCGT with carbon capture (KALiNA)
Utility
Not stated
Queue reference
Not stated
Target online
Not stated
Announced
2025-06-24
Verification
press
Coordinate
51.4189, -114.0068 (region)

Getting power in Alberta

Courting load loudly while the near-term connection queue is already spoken for.

The full Alberta record, with the route to power, the binding constraint and every dated policy event.

Sources

320-acre KALiNA Distributed Power site in Rocky View County near Crossfield. Capacity is held at the 170 MW press figure. AESO’s list carries no project named Crossfield; the closest candidate is P3154 Lone Pine Energy Park MPC Data Load, 280 MW in the 57-Airdrie planning area, applied 2024-10-11, the same day as the confirmed Myers and Alsike filings. Airdrie adjoins Crossfield and the timing lines up, but the name does not match and KALiNA’s own materials name only Myers, Alsike and Crossfield, so no link is asserted.

Other tracked projects in Alberta


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document