Beacon AI Data Centre Hub - Chestermere

Beacon Data Centres (Beacon AI) / Chestermere, AB

In queue

400 MW

announced

0 MW

energized

None of it is drawing power yet.

  1. 2025-02-25 Announced
  2. 2025-02-26 Filed with the operator 400 MW filed
  3. No date In service the operator has set no date

Power path
Grid
Generation tech
Not stated
Utility
AESO
Queue reference
P3107 Chestermere Enterprise A.I. Load (AESO, Calgary planning area, 400 MW DTS, ISD Under Review, applied 2025-02-26)
Target online
Not stated
Announced
2025-02-25
Verification
multiple
Coordinate
51.0501, -113.8225 (town)

Filed with the system operator

What this project has on file with AESO, which is a different act from announcing it. Transcribed from AESO's published connection list.

Reference Stage Filed In service Status
P3107 [object Object] 400 MW No date ISD Under Review

One entry totalling 400 MW filed, against 400 MW announced. Why those two figures differ.

Getting power in Alberta

Courting load loudly while the near-term connection queue is already spoken for.

The full Alberta record, with the route to power, the binding constraint and every dated policy event.

Sources

$4B investment presented to Chestermere council on 25 February 2025. AESO’s Connection Project List carries P3107 Chestermere Enterprise A.I. Load at 400 MW DTS in the Calgary planning area, applied 2025-02-26, one day after the council presentation and matching the capacity exactly. AESO does not name the applicant; the identification rests on that match of capacity, timing and location against the council record. Other Beacon AI Centers records tracked here: the Indus AI Hub and its thermal power plant at AUC Proceeding 30524, the Heartland thermal power plant at AUC Proceeding 30518, and the Saint John (Lorneville) project in New Brunswick.

Other tracked projects in Alberta


Last verified 2026-08-16. Corrections: sam@mccordinvestments.com