Beacon AI Hub, Heartland

Beacon AI Centers / Near Gibbons, Sturgeon County, AB

Filed for connection

800 MW

announced

0 MW

energized

None of it is drawing power yet.

A 920 MW gas plant about 7 km east of Gibbons in Sturgeon County, of which about 800 MW would power on-site data halls. The AUC held a written hearing on the plant that closed in July 2026 and has not ruled. AESO also lists two Beacon Heartland grid load requests of 400 MW each.


Power path
Hybrid
Setup
920 MW gas plant of about 200 reciprocating engines
Utility
AESO
Connection request
AESO P2934 Beacon Heartland A.I. Hub Load (400 MW), P3175 Beacon Heartland Data Load (400 MW)
Target online
Not stated
Announced
Not stated

Filed with the system operator

From AESO's connection list.

Reference Stage Filed In service Status
P2934 EN1 400 MW No date No date yet
P3175 EN1 400 MW No date No date yet

2 entries, 800 MW in total.

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.