Beacon AI Centers — Heartland Project Thermal Power Plant

Heartland Power Generation LP (Beacon AI Centers) / Alberta Industrial Heartland — Section 15, Township 56, Range 22, W4M; ~7 km east of Gibbons, Sturgeon County, AB

Announced

800 MW

announced

0 MW

energized

None of it is drawing power yet.

Not shown on the map. No location has been disclosed for this project beyond Alberta Industrial Heartland — Section 15, Township 56, Range 22, W4M; ~7 km east of Gibbons, Sturgeon County, AB. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.


Power path
Behind the fence
Generation tech
920 MW total capability natural gas thermal plant; ~800 MW supplied under normal operation to co-located on-site data halls
Utility
Not stated
Queue reference
AUC Proceeding 30518, Application 30518-A001 (power plant application)
Target online
Not stated
Announced
2026-08-16
Verification
public_filing
Coordinate
Not disclosed

Getting power in Alberta

Courting load loudly while the near-term connection queue is already spoken for.

The full Alberta record, with the route to power, the binding constraint and every dated policy event.

Sources

Before the AUC as Proceeding 30518, a written hearing: 920 MW of total capability, of which about 800 MW would supply co-located on-site data halls under normal operation. Filed under the Hydro and Electric Energy Act. The announced column carries the 800 MW of data centre load, not the total capability; the two are never summed. The posted schedule ran to the applicant's final written reply on 2026-08-04. No disposition has been posted, and the AUC listed the application as under review on 2026-08-16. Nothing here should be read as approval, rejection, or a timing commitment. AESO's connection list separately carries two grid load entries under the Beacon Heartland name, P2934 and P3175 at 400 MW each; those are grid filings held in this dataset's queue layer and are not this behind-the-fence generation application. Their megawatts are not combined with this record's. Same county as the Meta/GLDC record, from which nothing further is inferred. No coordinate is published.

Other tracked projects in Alberta


Last verified 2026-08-16. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document