McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / ON

Verified 2026-08-01

Validus Power Iroquois Falls Data Centre

Validus Power Corp / Iroquois Falls, Ontario (120MW gas-fired generating facility)

Announced

120 MW

announced

0 MW

energized

None of it is drawing power yet.


Power path
Behind the fence
Generation tech
behind-the-fence natural gas generation, crypto/HPC hosting
Utility
Not stated
Queue reference
Not stated
Target online
Not stated
Announced
2022-11-01
Verification
press
Coordinate
48.7667, -80.6833 (town)

Getting power in Ontario

Open door dressed in new gatekeeping: government now picks winners before IESO's technical process even starts.

The full Ontario record, with the route to power, the binding constraint and every dated policy event.

Sources

A November 2022 article projected operation by early 2023, and no source confirms energization, so the project is held at announced. The most recent source is dated January 2023: a 120 MW facility of this age may already be running without a fresh public source.

Other tracked projects in Ontario


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document