Compass Datacenters Toronto Campus (75-77 Fima Crescent, Etobicoke)

Compass Datacenters / 75-77 Fima Crescent, Etobicoke, Toronto

Operating

30 MW

announced

10 MW

energized

33% of what was announced is drawing power.


Power path
Grid
Generation tech
colocation, retrofit of existing logistics building
Utility
Toronto Hydro
Queue reference
Not stated
Target online
Not stated
Announced
2020-05-05
Verification
multiple
Coordinate
43.6467, -79.5764 (site)

Getting power in Ontario

Open door dressed in new gatekeeping: government now picks winners before IESO's technical process even starts.

The full Ontario record, with the route to power, the binding constraint and every dated policy event.

Sources

The first building supports a 30 MW critical IT load, of which the first 10 MW tranche has been completed and commissioned. Two independent sources: the company release and separate trade journalism. The most recent of them dates from 2020.

Other tracked projects in Ontario


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document