BUZZ HPC Greater Toronto AI Data Centre
BUZZ HPC (HIVE Digital) / Greater Toronto Area, ON
Announced
320 MW
announced
0 MW
energized
None of it is drawing power yet.
A C$3.5B, 320 MW AI campus on about 25 acres somewhere in the Greater Toronto Area. The exact site has not been published.
- 2026-05-18 Announced
- 2027-H2 Developer target
Not shown on the map. No location has been disclosed for this project beyond Greater Toronto Area, ON. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.
- Power path
- Grid
- Setup
- Grid power, closed-loop cooling
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- 2027-H2
- Announced
- 2026-05-18
Getting power in Ontario
Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.
Sources
- HIVE's BUZZ HPC Announces 320 MW Sovereign AI Infrastructure in Greater Toronto Area
- HIVE Achieves FY2026 Total Revenue of $297.8 Million, HIVE's BUZZ HPC Positioned for Growth
Other tracked projects in Ontario
- Algoma AI Data Centre Red Jar Energy Partners and Algoma Steel · 400 MW · Filed for connection
- STACK Toronto Campus STACK Infrastructure · 56 MW · Operating
- Cambridge AI Data Centre Related Digital, TowerBrook and Ascent · 54 MW · Operating
- Prologis Meadowvale Data Centre Prologis · 40 MW · Announced
- Yondr Toronto Data Centre Yondr · 27 MW · Operating
- Compass Toronto Campus Compass Datacenters · 27 MW · Operating
- 55H Brampton Data Centre 55H with CORE Data Centres · 20 MW · Operating
- Burlington Data Centre Applicant not disclosed · 20 MW · Announced
Updated 2026-10-14.