BUZZ HPC Greater Toronto AI Data Centre

BUZZ HPC (HIVE Digital) / Greater Toronto Area, ON

Announced

320 MW

announced

0 MW

energized

None of it is drawing power yet.

A C$3.5B, 320 MW AI campus on about 25 acres somewhere in the Greater Toronto Area. The exact site has not been published.

  1. 2026-05-18 Announced
  2. 2027-H2 Developer target

Not shown on the map. No location has been disclosed for this project beyond Greater Toronto Area, ON. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.


Power path
Grid
Setup
Grid power, closed-loop cooling
Utility
Not stated
Connection request
Not stated
Target online
2027-H2
Announced
2026-05-18

Getting power in Ontario

Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.