McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / BC

Verified 2026-08-01

Bell AI Fabric -- two additional undisclosed BC sites

Bell Canada / British Columbia (location undisclosed)

Announced

400 MW

announced

0 MW

energized

None of it is drawing power yet.

Not shown on the map. No location has been disclosed for this project beyond British Columbia (location undisclosed). Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.


Power path
Grid
Generation tech
AI training/inference
Utility
BC Hydro
Queue reference
Not stated
Target online
Not stated
Announced
2025-05-28
Verification
press
Coordinate
Not disclosed

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

Two further Bell AI Fabric sites described as 'in advanced planning' with combined 400+MW, part of Bell's ~500MW/six-site BC target. No locations disclosed -- coordinates correctly left null/0,0, flagged, do not place on a map.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document