IREN Canal Flats
IREN / Canal Flats, BC
Operating
30 MW
announced
30 MW
energized
Fully energized against what was announced.
IREN's first British Columbia site. IREN is taking out its bitcoin miners across its sites and plans liquid-cooled GPU deployments at Canal Flats in 2027.
- Power path
- Grid
- Setup
- Bitcoin mining, converting to AI cloud computing
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2019
- Announced
- Not stated
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 80 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Construction
Updated 2026-10-14.