IREN Canal Flats Data Center
IREN Ltd. (formerly Iris Energy) / Canal Flats, BC
Operating
30 MW
announced
30 MW
energized
Fully energized against what was announced.
- Power path
- Grid
- Generation tech
- Bitcoin ASIC mining, pivoting toward AI/GPU compute
- Utility
- BC Hydro
- Queue reference
- Not stated
- Target online
- 2019
- Announced
- Not stated
- Verification
- press
- Coordinate
- 50.1552, -115.8228 (town)
Getting power in British Columbia
Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.
The full British Columbia record, with the route to power, the binding constraint and every dated policy event.
Sources
IREN’s first British Columbia site, commissioned around 2019-2020, alongside Mackenzie and Prince George. Energized capacity is per IREN’s FY2025 10-K property table. A conversion toward high-performance compute has been announced; the workload mix is in transition and no split is asserted here.
Other tracked projects in British Columbia
- Bell AI Fabric -- two additional undisclosed BC sites Bell Canada · 400 MW · Announced
- Telus Kamloops sovereign AI data centre (expansion) Telus, in partnership with Government of Canada · 85 MW · Announced
- IREN Mackenzie Data Center IREN Ltd. (formerly Iris Energy) · 80 MW · Operating
- DMG Blockchain Christina Lake Data Center DMG Blockchain Solutions Inc. · 65 MW · Construction
- IREN Prince George Data Center IREN Ltd. (formerly Iris Energy) · 50 MW · Operating
- Bell AI Fabric Kamloops -- Thompson Rivers University site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada, with Groq (inference partner) · 7 MW · Operating
- Bell AI Fabric Merritt (with Buzz HPC) Bell Canada; Buzz HPC (subsidiary of HIVE Digital Technologies) as GPU tenant · 7 MW · Announced