IREN Canal Flats Data Center

IREN Ltd. (formerly Iris Energy) / Canal Flats, BC

Operating

30 MW

announced

30 MW

energized

Fully energized against what was announced.


Power path
Grid
Generation tech
Bitcoin ASIC mining, pivoting toward AI/GPU compute
Utility
BC Hydro
Queue reference
Not stated
Target online
2019
Announced
Not stated
Verification
press
Coordinate
50.1552, -115.8228 (town)

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

IREN’s first British Columbia site, commissioned around 2019-2020, alongside Mackenzie and Prince George. Energized capacity is per IREN’s FY2025 10-K property table. A conversion toward high-performance compute has been announced; the workload mix is in transition and no split is asserted here.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document