Bell AI Fabric Kamloops

Bell Canada, with Groq (inference partner) / Kamloops, BC

Operating

7 MW

announced

7 MW

energized

Fully energized against what was announced.

  1. 2025-05-28 Announced
  2. 2025-Q2 Developer target stated by the developer, not a filed date

Power path
Grid
Generation tech
AI inference (Groq LPU-based)
Utility
BC Hydro
Queue reference
Not stated
Target online
2025-Q2
Announced
2025-05-28
Verification
multiple
Coordinate
50.6745, -120.3273 (town)

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

First Bell AI Fabric site, 7MW, targeted June 2025 opening with Groq. 'Operating' status is inferred from later (March 2026) coverage treating this site as an established, existing part of the network -- reasonable but not a direct 'now operating' confirmation. Distinct from TELUS's separate, older Kamloops data centre.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document