McCord Investments

Power and industrial equipment sourcing

Send a requirement

Home / BC

Bell AI Fabric Kamloops

Bell Canada with Groq / Kamloops, BC

Operating

7 MW

announced

7 MW

energized

Fully energized against what was announced.

The first Bell AI Fabric site, 7 MW, built with Groq for AI inference.

  1. 2025-05-28 Announced
  2. 2025-Q2 Developer target

Power path
Grid
Setup
Grid power, Groq AI inference
Utility
BC Hydro
Connection request
Not stated
Target online
2025-Q2
Announced
2025-05-28

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.

Sources

Other tracked projects in British Columbia


Updated 2026-10-14.

External document

The publisher’s own file. It may download rather than open.

Open the document