Bell AI Fabric Kamloops, second site
Bell Canada / Kamloops, BC
Announced
26 MW
announced
0 MW
energized
None of it is drawing power yet.
Bell's second 26 MW AI data centre in Kamloops, separate from the Thompson Rivers University site. Bell has not named the location.
- 2025-05-28 Announced
- 2027 Developer target
- Power path
- Grid
- Setup
- Not stated
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2027
- Announced
- 2025-05-28
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 80 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Construction
Updated 2026-10-14.