IREN Mackenzie

IREN / Mackenzie, BC

Operating

80 MW

announced

80 MW

energized

Fully energized against what was announced.

Running at 80 MW since December 2022. IREN is replacing bitcoin miners with GPUs here, backed by a US$2.4 billion financing in August 2026, with deliveries through the end of 2026.


Power path
Grid
Setup
Bitcoin mining, converting to AI cloud computing
Utility
BC Hydro
Connection request
Not stated
Target online
2022
Announced
Not stated

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.