IREN Mackenzie
IREN / Mackenzie, BC
Operating
80 MW
announced
80 MW
energized
Fully energized against what was announced.
Running at 80 MW since December 2022. IREN is replacing bitcoin miners with GPUs here, backed by a US$2.4 billion financing in August 2026, with deliveries through the end of 2026.
- Power path
- Grid
- Setup
- Bitcoin mining, converting to AI cloud computing
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2022
- Announced
- Not stated
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Construction
Updated 2026-10-14.