McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / BC

Verified 2026-08-01

IREN Mackenzie Data Center

IREN Ltd. (formerly Iris Energy) / Mackenzie, BC

Operating

80 MW

announced

80 MW

energized

Fully energized against what was announced.


Power path
Grid
Generation tech
Bitcoin ASIC mining, pivoting toward AI/GPU compute
Utility
BC Hydro
Queue reference
Not stated
Target online
Not stated
Announced
Not stated
Verification
press
Coordinate
55.3372, -123.0965 (town)

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

Part of IREN’s British Columbia portfolio. Energized capacity is per IREN’s FY2025 10-K property table. A conversion toward high-performance compute has been announced; the workload mix is in transition and no split is asserted here. An earlier 50 MW to 80 MW expansion claim from 2022 could not be independently confirmed.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document