Malachite One Data Centre

Emerald Energy Technologies (Tourmaline Oil) / Near Edson, Yellowhead County, AB

Announced

1.0 GW

announced

0 MW

energized

None of it is drawing power yet.

Tourmaline's subsidiary proposes a power plant and data centre next to its Banshee gas plant that would turn gas into roughly one gigawatt of electricity. The company says about 930 MW would come from on-site gas and the rest from the grid, with a first phase running in 2028. It still needs land-use, water, power plant and Crown land approvals.

  1. 2026-08-12 Announced
  2. 2028 Developer target

Power path
Hybrid
Setup
On-site gas generation, about 930 MW, plus some grid power
Utility
Not stated
Connection request
Not stated
Target online
2028
Announced
2026-08-12

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.