101 MW
announced
0 MW
energized
Originally Kiwetinohk Energy's Opal gas power project, bought by Bitdeer in February 2025, on a 19-acre site. Bitdeer broke ground on the 101 MW gas plant in June 2026 and now expects to energize in the fourth quarter of 2027, for bitcoin mining with room for AI.
- 2025-02-04 Announced
- 2025-08-28 Filed with the operator 0 MW filed
- 2027-08-06 In service
- 2027-Q4 Developer target
- Power path
- Behind the fence
- Setup
- On-site gas plant, 101 MW, licensed and permitted
- Utility
- AESO
- Connection request
- AESO P3141 Opal Data Load (0 MW)
- Target online
- 2027-Q4
- Announced
- 2025-02-04
Filed with the system operator
From AESO's connection list.
| Reference | Stage | Filed | In service | Status |
|---|---|---|---|---|
| P3141 | EN1 | Not stated | 2027-08-06 | Dated |
One entry, 0 MW in total.
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Bitdeer Announces Strategic Acquisition of 101 MW Site and Gas-fired Power Project in Alberta
- Bitdeer breaks ground on new energy and digital infrastructure facility in Alberta, Canada
- Bitdeer Reports Unaudited Financial Results for the Second Quarter of 2026
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
Updated 2026-10-14.