Yondr Toronto Data Centre

Yondr / Toronto, ON

Operating

27 MW

announced

Not stated

energized

Yondr energized the 27 MW building in April 2026 and says it will be ready for service in mid-2026. It uses closed-loop cooling with no water used for evaporation.

  1. 2025-01-29 Announced
  2. 2026 Developer target

Power path
Grid
Setup
Grid power, closed-loop cooling
Utility
Toronto Hydro
Connection request
Not stated
Target online
2026
Announced
2025-01-29

Getting power in Ontario

Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.