Crusoe AI Data Centre, Alsike Energy Park

Crusoe with KALiNA Distributed Power / Near Drayton Valley, Brazeau County, AB

Announced

170 MW

announced

0 MW

energized

None of it is drawing power yet.

One of three KALiNA Distributed Power energy parks paired with Crusoe, on a 160-acre site in Brazeau County. Crusoe and KALiNA put each site at 170 MW of gas generation. The 280 MW data load request at the site was cancelled in August 2026, and a 178 MW gas plant there went back on AESO's list in October 2026 with no data load attached.


Power path
Behind the fence
Setup
Gas combined cycle (KALiNA), built to add carbon capture later
Utility
AESO
Connection request
AESO P3251 Alsike Gas (178 MW gas plant); the earlier 280 MW data load request was cancelled
Target online
Not stated
Announced
2025-06-24

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.