Crusoe AI Data Centre, Alsike Energy Park
Crusoe with KALiNA Distributed Power / Near Drayton Valley, Brazeau County, AB
Announced
170 MW
announced
0 MW
energized
None of it is drawing power yet.
One of three KALiNA Distributed Power energy parks paired with Crusoe, on a 160-acre site in Brazeau County. Crusoe and KALiNA put each site at 170 MW of gas generation. The 280 MW data load request at the site was cancelled in August 2026, and a 178 MW gas plant there went back on AESO's list in October 2026 with no data load attached.
- Power path
- Behind the fence
- Setup
- Gas combined cycle (KALiNA), built to add carbon capture later
- Utility
- AESO
- Connection request
- AESO P3251 Alsike Gas (178 MW gas plant); the earlier 280 MW data load request was cancelled
- Target online
- Not stated
- Announced
- 2025-06-24
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Crusoe, Kalina partner to develop natural gas powered AI data centers in Alberta, Canada
- Crusoe AI Data Centres Alberta
- AESO Connection Project List, October 2026
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
Updated 2026-10-14.