Crusoe AI Data Centre - Alsike Energy Park

Crusoe (Crusoe Cloud); KALiNA Distributed Power (power) / Brazeau County, AB (Alsike, near Drayton Valley)

In queue

280 MW

announced

0 MW

energized

None of it is drawing power yet.

  1. 2024-10-11 Filed with the operator 280 MW filed
  2. 2025-06-24 Announced
  3. No date In service the operator has set no date

Power path
Behind the fence
Generation tech
natural gas CCGT with carbon capture (KALiNA)
Utility
AESO
Queue reference
P3153 Alsike Energy Park MPC Data Load (AESO, Drayton Valley planning area, 280 MW DTS, ISD Under Review, applied 2024-10-11)
Target online
Not stated
Announced
2025-06-24
Verification
multiple
Coordinate
53.2202, -114.9836 (region)

Filed with the system operator

What this project has on file with AESO, which is a different act from announcing it. Transcribed from AESO's published connection list.

Reference Stage Filed In service Status
P3153 [object Object] 280 MW No date Recently Cancelled

One entry totalling 280 MW filed, against 280 MW announced. Why those two figures differ.

Getting power in Alberta

Courting load loudly while the near-term connection queue is already spoken for.

The full Alberta record, with the route to power, the binding constraint and every dated policy event.

Sources

One of three KALiNA Distributed Power energy-park sites paired with Crusoe, on a 160-acre site. Capacity is 280 MW, the load AESO has on file for this site by name, on the same basis as Myers Energy Park. AESO places P3153 Alsike Energy Park in the 30-Drayton Valley planning area; Alsike is a hamlet in Brazeau County.

Other tracked projects in Alberta


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document