Map / AB
Verified 2026-08-01
Crusoe AI Data Centre - Alsike Energy Park
Crusoe (Crusoe Cloud); KALiNA Distributed Power (power) / Brazeau County, AB (Alsike, near Drayton Valley)
In queue
280 MW
announced
0 MW
energized
None of it is drawing power yet.
- 2024-10-11 Filed with the operator 280 MW filed
- 2025-06-24 Announced
- No date In service the operator has set no date
- Power path
- Behind the fence
- Generation tech
- natural gas CCGT with carbon capture (KALiNA)
- Utility
- AESO
- Queue reference
- P3153 Alsike Energy Park MPC Data Load (AESO, Drayton Valley planning area, 280 MW DTS, ISD Under Review, applied 2024-10-11)
- Target online
- Not stated
- Announced
- 2025-06-24
- Verification
- multiple
- Coordinate
- 53.2202, -114.9836 (region)
Filed with the system operator
What this project has on file with AESO, which is a different act from announcing it. Transcribed from AESO's published connection list.
| Reference | Stage | Filed | In service | Status |
|---|---|---|---|---|
| P3153 | [object Object] | 280 MW | No date | Recently Cancelled |
One entry totalling 280 MW filed, against 280 MW announced. Why those two figures differ.
Getting power in Alberta
Courting load loudly while the near-term connection queue is already spoken for.
The full Alberta record, with the route to power, the binding constraint and every dated policy event.
Sources
- Crusoe, Kalina partner to develop natural gas powered AI data centers in Alberta, Canada
- Crusoe AI Data Centres Alberta
- AESO Connection Project List, July 2026 (P3153 Alsike Energy Park, 280 MW)
One of three KALiNA Distributed Power energy-park sites paired with Crusoe, on a 160-acre site. Capacity is 280 MW, the load AESO has on file for this site by name, on the same basis as Myers Energy Park. AESO places P3153 Alsike Energy Park in the 30-Drayton Valley planning area; Alsike is a hamlet in Brazeau County.
Other tracked projects in Alberta
- Genesee Data Centre Project Capital Power · 1.5 GW · In queue
- Wonder Valley AI Data Centre Park (Phase 1) O'Leary Ventures · 1.4 GW · Announced
- Beacon AI Hub — Indus (with Indus Project Thermal Power Plant) Beacon AI Centers / Indus Power Generation LP · 1.2 GW · Announced
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Announced
- Meta Data Center (Sturgeon County) Meta Platforms Inc. · 970 MW · In queue
- Beacon AI Centers — Heartland Project Thermal Power Plant Heartland Power Generation LP (Beacon AI Centers) · 800 MW · Announced
- Black Bear Power Project (data centre power supply) Teton Digital LLC (formerly Kiwetinohk Energy Corp.) · 466 MW · Announced
- Beacon AI Data Centre Hub - Chestermere Beacon Data Centres (Beacon AI) · 400 MW · In queue
Last verified 2026-08-01. Corrections: sam@mccordinvestments.com