Map / AB
Verified 2026-08-01
Crusoe AI Data Centre - Myers Energy Park
Crusoe (Crusoe Cloud); KALiNA Distributed Power (power) / Red Deer County, AB (Myers Energy Park)
In queue
280 MW
announced
0 MW
energized
None of it is drawing power yet.
- 2024-10-11 Filed with the operator 280 MW filed
- 2025-06-24 Announced
- No date In service the operator has set no date
- Power path
- Behind the fence
- Generation tech
- natural gas CCGT with carbon capture (KALiNA)
- Utility
- AESO
- Queue reference
- P3155 Myers Energy Park MPC Data Load (AESO, Red Deer planning area, 280 MW DTS, ISD Under Review, applied 2024-10-11)
- Target online
- Not stated
- Announced
- 2025-06-24
- Verification
- multiple
- Coordinate
- 52.0333, -113.7833 (region)
Filed with the system operator
What this project has on file with AESO, which is a different act from announcing it. Transcribed from AESO's published connection list.
| Reference | Stage | Filed | In service | Status |
|---|---|---|---|---|
| P3155 | [object Object] | 280 MW | No date | Recently Cancelled |
One entry totalling 280 MW filed, against 280 MW announced. Why those two figures differ.
Getting power in Alberta
Courting load loudly while the near-term connection queue is already spoken for.
The full Alberta record, with the route to power, the binding constraint and every dated policy event.
Sources
- Crusoe, Kalina partner to develop natural gas powered AI data centers in Alberta, Canada
- Crusoe AI Data Centres Alberta
- AESO Connection Project List, July 2026 (P3155 Myers Energy Park, 280 MW)
One of three KALiNA Distributed Power energy-park sites paired with Crusoe, on a 65-acre site. Capacity is 280 MW, the load AESO has on file for this site by name; the June 2025 press figure of roughly 170 MW per site across three sites is superseded by the filing. AESO places P3155 Myers Energy Park in the 35-Red Deer planning area.
Other tracked projects in Alberta
- Genesee Data Centre Project Capital Power · 1.5 GW · In queue
- Wonder Valley AI Data Centre Park (Phase 1) O'Leary Ventures · 1.4 GW · Announced
- Beacon AI Hub — Indus (with Indus Project Thermal Power Plant) Beacon AI Centers / Indus Power Generation LP · 1.2 GW · Announced
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Announced
- Meta Data Center (Sturgeon County) Meta Platforms Inc. · 970 MW · In queue
- Beacon AI Centers — Heartland Project Thermal Power Plant Heartland Power Generation LP (Beacon AI Centers) · 800 MW · Announced
- Black Bear Power Project (data centre power supply) Teton Digital LLC (formerly Kiwetinohk Energy Corp.) · 466 MW · Announced
- Beacon AI Data Centre Hub - Chestermere Beacon Data Centres (Beacon AI) · 400 MW · In queue
Last verified 2026-08-01. Corrections: sam@mccordinvestments.com