McCord Investments

Power and industrial equipment sourcing

Send a requirement Requirement

Map / AB

Verified 2026-08-02

Hut 8 Drumheller

Hut 8 Corp. / Drumheller, AB

Operating

42 MW

announced

42 MW

energized

Fully energized against what was announced.


Power path
Grid
Generation tech
Grid-connected. Bitcoin self-mining site.
Utility
AESO
Queue reference
Not stated
Target online
Not stated
Announced
Not stated
Verification
public_filing
Coordinate
51.4636, -112.7194 (town)

Getting power in Alberta

Courting load loudly while the near-term connection queue is already spoken for.

The full Alberta record, with the route to power, the binding constraint and every dated policy event.

Sources

ADDED ON AUDIT (2026-08-02): the site was missing from the dataset entirely. Hut 8 reported in its Q1 2026 10-Q that its Drumheller, Alberta site was reenergized in March 2026 at 42 MW. Its absence understated the national energized total. Added at operating status on a securities filing, the strongest evidence tier. Note it is proof-of-work mining, which raises the crypto share of energized capacity rather than the AI share.

Other tracked projects in Alberta


Last verified 2026-08-02. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document