Telus Kamloops sovereign AI data centre (expansion)

Telus, in partnership with Government of Canada / Kamloops, BC

Announced

85 MW

announced

0 MW

energized

None of it is drawing power yet.

  1. 2026 Developer target stated by the developer, not a filed date
  2. 2026-05-12 Announced

Power path
Grid
Generation tech
Sovereign AI compute (NVIDIA GPU training clusters)
Utility
BC Hydro
Queue reference
Not stated
Target online
2026
Announced
2026-05-12
Verification
press
Coordinate
50.6745, -120.3273 (town)

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

The 85 MW figure is a network total shared across three sites, with Mount Pleasant and Yaletown, rather than a figure for this site. The three Telus rows are not summed.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document