Telus Kamloops AI Factory
Telus / Kamloops, BC
Announced
Not stated
announced
0 MW
energized
Telus is expanding its existing Kamloops data centre into an AI factory, due online later in 2026. It is one of three Telus AI sites in British Columbia, with Mount Pleasant and 150 West Georgia in Vancouver, sharing 85 MW of power from BC Hydro to start. Telus says the three will reach more than 150 MW by 2032.
- 2026 Developer target
- 2026-05-12 Announced
- Power path
- Grid
- Setup
- Grid power, NVIDIA GPUs
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2026
- Announced
- 2026-05-12
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
- Telus and Government of Canada advance work to scale Canada's sovereign AI infrastructure
- Telus proposing to build three new data centres in British Columbia
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 80 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating