Telus AI data centre -- Mount Pleasant (M3 building, 111 East 5th Ave)

Telus / Vancouver, BC (Mount Pleasant)

Announced

0 MW

announced

0 MW

energized

  1. 2026 Developer target stated by the developer, not a filed date
  2. 2026-05-12 Announced

Power path
Grid
Generation tech
Sovereign AI compute; conversion of existing office building (M3), waste-heat recovery via Vancouver Neighbourhood Energy Utility
Utility
BC Hydro
Queue reference
Not stated
Target online
2026
Announced
2026-05-12
Verification
press
Coordinate
49.2827, -123.1207 (town)

Getting power in British Columbia

Effectively closed to unsolicited load: capacity is capped and allocated by competitive call, not first-come-first-served.

The full British Columbia record, with the route to power, the binding constraint and every dated policy event.

Sources

Part of the three-site Telus network whose 85 MW total is reported at Kamloops. No per-site figure has been disclosed, so none is shown.

Other tracked projects in British Columbia


Last verified 2026-08-01. Corrections: sam@mccordinvestments.com

External document

This is hosted by the publisher, not by McCord, and your browser may download it rather than open it in a tab.

Open the document