Telus AI Data Centre, 150 West Georgia
Telus / Downtown Vancouver, BC
Announced
Not stated
announced
0 MW
energized
A Telus AI data centre at 150 West Georgia Street, built on top of Creative Energy's district steam plant and cooled by a closed liquid loop, due online in 2029. Part of Telus's three-site network sharing 85 MW from BC Hydro.
- 2026-05-12 Announced
- 2029 Developer target
- Power path
- Grid
- Setup
- Grid power, liquid-cooled, above a district steam plant
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2029
- Announced
- 2026-05-12
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
- Telus and Government of Canada advance work to scale Canada's sovereign AI infrastructure
- Telus proposing to build three new data centres in British Columbia
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 80 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
Updated 2026-10-14.