Northern Forge Power Project
Teton Digital LLC / South of Fox Creek, AB
Announced
200 MW
announced
0 MW
energized
None of it is drawing power yet.
A $500M, 200 MW behind-the-meter gas project on 155 acres about 35 km south of Fox Creek. Teton says it plans 30 MW in the first half of 2027, 100 MW by the end of 2027 and 200 MW in 2028.
- 2026-07-14 Announced
- 2028 Developer target
- Power path
- Behind the fence
- Setup
- Gas plant on site
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- 2028
- Announced
- 2026-07-14
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
Updated 2026-10-14.