TNE and Data District Data Centres, Phase 1

Technologies New Energy and Data District / Olds, Calgary, Edmonton and Bonnyville, AB

Announced

240 MW

announced

0 MW

energized

None of it is drawing power yet.

Four facilities, at Olds, Calgary, Edmonton and Bonnyville, with a combined budget of $1.26B and 240 MW in total, and no split between the sites published. TNE says it will power them mostly from its own modular gas plants and batteries, with some power from the grid. Olds is first, and Bonnyville is due to start construction in 2027.

Not shown on the map. No location has been disclosed for this project beyond Olds, Calgary, Edmonton and Bonnyville, AB. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.


Power path
Hybrid
Setup
TNE modular gas plants and batteries, plus some grid power
Utility
AESO; FortisAlberta in Olds
Connection request
Not stated
Target online
Not stated
Announced
2025-12-01

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.